More preparation work done on the Gold Light Dredge arm

Categories:Goldfields Trail

Bruce, Mike and Terry spent a concerted mornings effort on the old arm removing some spurious pipe work. Thanks very much to McIntre Engineering for lending us the generator and big 9′ grinder – it sure made things easier!Image

Image

Author:

Leave a Reply